This course aims to enable the trainee to carry out surveying works to the fullest extent and to train him to use the survey equipment with high professionalism.
-Total station:
· How does Total Station work, and how to set it up.
· Anchor points with three-dimensional XYZ coordinates.
· Projection angles, straight lines, curves, points, buildings, Land divider, column axes, footings, excavations, road axes.
· Transferring information from the total station to the computer and back.
· Setpoints and take coordinates from AutoCAD software.
· Cutting and filling calculation using the Civil 3D program.
· Surveying lifting with on-site field applications.
-Level:
· The device’s working mechanism and how to set it up.
· Transferring the points by way of the height of the scale surface BENCHMARK
· Measuring the levels of excavations, footings, and columns.
· Method of calculating the height of the walls and the levels of the road layers.
· Application in site for Contour lines and topography.