Surveying Level and Total station

  • 20 Hours

Description

This course aims to enable the trainee to carry out surveying works to the fullest extent and to train him to use the survey equipment with high professionalism.

Outline

-Total station:

·         How does Total Station work, and how to set it up.

·         Anchor points with three-dimensional XYZ coordinates.

·         Projection angles, straight lines, curves, points, buildings, Land divider, column axes, footings, excavations, road axes.

·         Transferring information from the total station to the computer and back.

·         Setpoints and take coordinates from AutoCAD software.

·         Cutting and filling calculation using the Civil 3D program.

·         Surveying lifting with on-site field applications.

 

-Level:

·         The device’s working mechanism and how to set it up.

·         Transferring the points by way of the height of the scale surface BENCHMARK

·         Measuring the levels of excavations, footings, and columns.

·         Method of calculating the height of the walls and the levels of the road layers.

·         Application in site for Contour lines and topography.